Bognor Regis Renovation Case Study | Sixes Carpentry

Bognor Regis renovation: planning around budget, access and existing walls.

A coordinated kitchen, bathroom, fitted-storage and external renovation delivered around the real constraints of an occupied property.

This Bognor Regis project brought several parts of the home together under one managed programme. The brief needed practical, bespoke results while respecting a tight customer budget and demanding timescales.

The challenges at the start

The existing walls were uneven and in poor condition, access to the property was restricted, and the available budget had to work across several rooms and external tasks. Each issue affected the order of work, the materials needed and the details that could be resolved cleanly.

Planning the whole renovation

Sixes Carpentry coordinated project planning, materials management and the bespoke elements across the renovation. The work was sequenced around access and timescale constraints, while designs and fitting details were adapted to the conditions found on site.

Kitchen: before and after

Bathroom: work in progress and after

These photographs show different bathroom areas within the same Bognor Regis renovation rather than one continuous camera position.

Clean bath area during fit-out with large-format wall tiles, exposed services and unfinished subfloor
During — bath-wall fit-outLarge-format wall tiles were set out around the bath, window and concealed services.
Clean shower area during fit-out with textured wall tiles, tile spacers and exposed service connections
During — shower-area fit-outThe shower area and concealed sanitaryware connections were coordinated before final fitting.
Completed compact bathroom with fitted bath, vanity, toilet and grey floor
After — completed bathroomA compact layout brought the bath, vanity and sanitaryware together with clean, practical fitted lines.

Rear of the property: before and after our phase

Rear of the terraced property at the start of renovation with old structures removed
BeforeThe restricted rear access and existing structures before the new work was formed.
Rear of the property after the external carpentry phase with new covered structure and landscaped garden
After — our external phase completeThe new rear structure and garden layout after Sixes Carpentry's contracted phase, ready for the remaining finishes.

The result

The kitchen, bathroom, external work and bespoke fitted wardrobes in Felpham were completed as a coordinated renovation. Careful management of the programme, materials and site conditions helped turn a demanding brief into finished spaces the customer was happy with.

Project location: Bognor Regis, West Sussex. Photographs show Sixes Carpentry's own project work.

Call nowGet a quote