Carpentry for house extensions and renovations in Bognor Regis.
Structural, first-fix and finishing carpentry brought together around the drawings, existing building and agreed responsibilities for the project.
Connecting the early timber work to the finished interior.
Extension and renovation projects depend on sequence. Structural openings, floor and roof timber, partitions and first-fix details influence the stairs, doors, fitted rooms and visible junctions that follow.
Sixes Carpentry can undertake an agreed carpentry package or coordinate defined renovation stages where that responsibility is included. The quotation sets out what is supplied, which drawings apply, who covers specialist work and where the handovers sit.
- Structural timber and first-fix carpentry.
- Partitions, openings, floors and roof elements to issued information.
- Doors, stairs, skirtings, architraves and fitted interiors.
- Kitchen, bathroom and storage carpentry where included.
From old conservatory to a finished utility-room extension.
This local build included removal, footings, drainage and service changes, a utility room with WC, the full external envelope, new patio doors, paving and turf.
“Lovely job. The project was finished on time and within budget, and the quality was bang on. No issues from Building Control, and my wife loves the new utility room!”
Information that makes an extension quote useful.
Send the latest drawings, site photographs, programme and the carpentry package you need priced.
Before the scope is fixed.
Which extension stages can you undertake?
Depending on the agreed scope, work can include structural timber, first fix, stairs, doors, skirtings, fitted storage, kitchen carpentry and finishing details.
Do you manage every building trade?
The exact responsibilities vary by project. Coordinated renovation elements, specialist trades and exclusions are identified in the quotation rather than assumed.
Can you work from architectural and structural drawings?
Yes. Current issued information is important for structural and dimensional work, alongside verification of the actual site conditions.
What should I send first?
Send the address, current drawings, specifications, site photographs, programme information and a clear description of the carpentry package.
