2026 planning guide · West Sussex

How much do new-build carpentry packages cost?

New-build work should be compared on the same drawings, inclusions, plot count and programme assumptions. The possible range is intentionally broad because one plot and a phased development are not comparable scopes.

New-build structural carpentry used to explain package pricing
Indicative rangeFrom a single stage to full multi-plot packages

A clearly defined first-fix, roof or second-fix stage can be priced on its own; larger packages can combine several stages or plots.

How Sixes uses these figures

The ranges are early planning allowances for defined carpentry stages, not interchangeable prices for different house types or plot counts. Actual pricing depends on drawing revisions, package boundaries, material supply, repetition and the site programme.

They can help frame an initial scope conversation. A useful request includes the site address, current drawings and structural information, specification, schedules, plot count, programme and whether the package is labour only or supply and installation.

Typical planning ranges

Single-stage package

Often from £5,000–£20,000+

Could cover a defined first-fix, second-fix or smaller roof scope.

Whole-plot carpentry package

Often £15,000–£50,000+

The stages included, house type, supply arrangement and programme determine the total.

Multi-plot programme

Priced from drawings

Repetition can improve efficiency while sequencing and programme carry their own requirements.

What changes the price?

  • Plot count and repetition
  • Labour-only versus supply and fit
  • Access, crane and scaffold provision
  • Programme, sequencing and drawing quality

What a useful quotation should make clear

Compare the written scope rather than the final number alone. Check who supplies each item, what preparation and making good are included, which assumptions rely on unseen conditions, how variations are agreed and whether VAT is included. For larger work, professional fees, statutory approvals and contingency should sit visibly beside the construction figure.

Important

Figures are broad planning allowances, not quotations or offers. Confirm whether VAT, material supply, access equipment, lifting, waste and other trade interfaces are included in each written price. Drawing revisions, site conditions, specification and programme can change the total.

From guide to project

Compare the scope before you compare prices

Explore the new-build carpentry packages, then the Littlehampton second-fix project for a real local finishing stage. Email drawings, specification, plot schedule and programme to define the work you want priced.

Builders and developers

Send your package for pricing

Email the current drawings, specification, schedules, plot count, site address and target programme. Please identify whether you need labour only or supply and installation.