New-build carpentry depends on repeatable quality, clear programme information and accurate work across every plot or phase.

Floor systems set the next level
Engineered joists and metal-web systems need accurate perimeter details, trimmers and openings. Getting that stage right supports decking, services and the structure above.
Decking needs the same level of control
Edges, joints and openings should follow the agreed layout so the deck gives the following trades a safe and consistent working surface.
Programme information keeps work moving
Plot sequence, access, material drops and target dates all influence delivery. A defined package and clear communication make output more predictable.

Key points to carry into the project
- Confirm plot and phase information early
- Coordinate openings before decking
- Keep floor and roof packages consistent
- Plan access and material handling around the programme